Preparing The Hood / Grill Assembly - Masport BG6286BS-WS-RB Owner's Manual

Masport 4/6 burner 210 series
Table of Contents

Advertisement

9.
Assemble Left door (item 10) and Right door (item 11) using 4pcs Screw M6×12 (item a), 4 Handle brackets (item 12) and 2
Handles (item 13), then assemble the door assemblies as the picture.
13
12
10

PREPARING THE HOOD / GRILL ASSEMBLY

Open the hood carton and remove the warming rack (item 23)
Lift up and out the polystyrene corner packing.
Remove the protective layer from the hood.
Cut open all sides with a knife taking care not to damage the hood or grill in the process.
Open the carton walls outwards and flatten. Remove the polystyrene packing from beneath the grill.
Open the hood and remove in order:
Packed cartons (some are empty and used as a gap filler) and any polystyrene packaging
Grill first, then hotplate
Remove the layer of cardboard
Remove extra feature options if any. Some specific barbecue models include some extra feature items.
At the rear you will locate the drip tray (item 18) remove this, (it is packed in the reverse). This may require the removal of the 2x step Screws
(item e)
The Hood / Grill is now ready to be lifted onto the cabinet. This is a large and heavy assembly which requires two persons to lift it safely into
position.
10. 1)
Assemble the hood and grill assembly (item 14) to the cabinet trolley with 4pcs Screw (SS) M6*12 (item b) and 4pcs fibre washer (item c) from
the fastener kit.
2)
In some barbecue models the knobs are not fitted to the grill then assemble 6 pcs knob (item 15) to the valve shaft on the body
assembly, as per the illusration below.
3)
If the rear burner knob is not fitted to the grill assemble 1 x knob - Rear burner (item 34) to the Rear burner valve shaft.
12
Note!
To keep screw slot against screwdriver pass screw
through ribbon of plastic, hold both together,
assemble screw to handle, remove plastic, and re-
use for other three screws.
Screw M6*12
M6*12
Note!
Once the cabinet has been fully assembled, and
11
the doors open and close correctly with even
clearances top and bottom, and side to side, the
screws can now be fully tightened.
14
Screw SS M6*12
Big fibre washer
11. Loosen the 3 Screws (item b), remove the 4th & 5th screws, then assemble the heat shield (item 33) and left hand side shelf (item 16) to the
appliance with 5pcs Screw (SS) M6*12 (item b). Level the top of the table and secure.
If the timer knob is not fitted then, fit one knob (item 15) on the shaft of the timer on the side table. Refer to the timer section for correct operating
procedure.
16 (b)
Screw SS M6*12 (b)
33
4th & 5th
12. Loosen fully but do not remove 4 screws (item b) as shown. Remove two screws 5 & 6, lower the side table over the screw heads. Fasten the four
screws to secure the side table. Refit screws 5 & 6, screw 6 secures the facia which may require frontal pressure to align this hole. Level the top of
the table and secure.
When the Timer is OFF the rounded shaft contour faces the
Top/ 12 o'clock position and the flat spring metal insert grips
the round face of the shaft of valve.
When the Timer is OFF the flat on the
shaft faces the Bottom / 6 o'clock
position and the Flat on the knob
insert should match this position.
14
Screw SS M6*12
Big fibre washer
15
15
13

Advertisement

Table of Contents
loading

Table of Contents