Chapter 2
Installing the Device
IMPORTANT!
Do not install the RUGGEDCOM RSG920P in a nuclear power plant or other nuclear-related facilities.
IMPORTANT!
The RUGGEDCOM RSG920P must be located in an area accessible only by qualified service
personnel or other authorized users. Operation of the device is permitted only when this requirement is
met.
The general procedure for installing the device is as follows:
1. Mount the device to a rack or panel.
2. Connect power to the device and ground the device to safety Earth.
3. Connect the failsafe alarm relay.
4. Connect the digital inputs.
5. Connect the device to the network.
These steps, and other related information, are described in the following sections:
Section 2.1, "Required Tools and Materials"
Section 2.2, "Mounting the Device"
Section 2.3, "Connecting Power"
Section 2.4, "Grounding the Device"
Section 2.5, "Connecting the Failsafe Alarm Relay"
Section 2.6, "Connecting the Digital Inputs"
Section 2.7, "Inserting/Removing the MicroSD Card"
Section 2.8, "Connecting to the Device"
Section 2.9, "Gigabit Ethernet 1000Base-TX Cabling Recommendations"
Section 2.1

Required Tools and Materials

The following tools and materials are required to install the RUGGEDCOM RSG920P:
RUGGEDCOM RPS1300 or equivalent 54 VDC output power supply
AC power cord (16 AWG)
CAT-5 Ethernet cables
Flathead screwdriver
Phillips screwdriver
4 x #8-32 screws
6
Tools/Materials
For supplying PoE power to the device.
For connecting power to the device.
For connecting the device to the network.
For mounting the device to a DIN rail.
For mounting the device to a panel.
For mounting the device to a panel.
RUGGEDCOM RSG920P
Installation Guide
Purpose
Required Tools and Materials

Advertisement

Table of Contents
loading

Table of Contents