Alvarion BreezeACCESS VL 5.4 System Manual page 46

Breezeaccess vl series
Table of Contents

Advertisement

3-16
c.
9.
If a BS-PS-AC-VL power supply is used, connect the AC power cord to
the AC In jack of the BS-PS-AC-VL power supply. If a redundant
power supply module is installed, connect an AC power cord also to
the second AC power module. Connect the power cord(s) to the mains
outlet.
10.
Switch the BS-PS-AC/DC-VL power supplies to ON. Verify that all
power indicator LEDs on the BS-PS-AC/DC-VL front panel are ON
and that the OVERTEMP alarm indicator is off. Refer to Table 3-1 on
page 3-13 for a description of these LEDs.
11.
Configure the basic parameters in all BS-AU-VL modules as described
in Configuring Basic Parameters on page 4-2.
12.
Connect the 10/100 BaseT connector(s) to the network. The cable
connection should be straight Ethernet if connecting the indoor unit
to a Hub/Switch and a crossed cable if connecting it directly to a PC
Network Interface Card (NIC).
NOTE:
The length of each of the Ethernet cables (the cable connecting the indoor unit to the user's
equipment and the Indoor-to-Outdoor cable), should not exceed 100 meters.
13.
NOTE:
Reset the unit using the RESET push button after connecting or reconnecting the indoor
and outdoor units with the indoor-to-outdoor cable.
Connect the shield to the ground.
BreezeACCESS VL System Manual

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Su-a-24-vlSu-ra-vlSu-ni-vlSu-a-54-vl

Table of Contents