Renishaw ATOM Installation Manual page 11

Rotary encoder systems
Hide thumbs Also See for ATOM:
Table of Contents

Advertisement

Approved ESD precautions must be followed at all times during readhead electrical connection.
The FPC cable must be connected before fitting the readhead lid. The lid is secured by the readhead mounting screws.
Inserting the FPC cable
1
Ensure the locking lever is up (open) before fully
inserting the FPC cable into the connector.
NOTE: Check correct orientation of cable before
inserting into the connector. Readhead will be
shipped with connector in the open position.
Removing the FPC cable
1
Placing your finger on the whole of the
locking lever, slowly lift it up and away to
disengage the locking mechanism.
Do not use tools such as screwdrivers
or tweezers to open the locking lever
as this may cause damage to the
connector or PCB.
ATOM
rotary installation guide
2
Applying pressure to the whole locking lever
push it down to lock the FPC cable in place.
NOTE: Do not push the locking lever down if
no FPC cable is inserted as this will damage
the locking mechanism.
2
Ensure locking lever is fully open before
removing the FPC cable.
3
When the system has been connected, proceed with
'Readhead mounting and alignment' and
'System calibration' sections.
3
Pull the FPC cable straight back to remove it.
Do not pull upwards or sideways as
this may damage the readhead.
9

Advertisement

Table of Contents
loading

Table of Contents