Iup Monitoring Procedure; Checking Intrauterine Pressure Cable Function - EDAN F6 User Manual

F series festal & material monitor
Hide thumbs Also See for F6:
Table of Contents

Advertisement

F Series Fetal & Maternal Monitor User Manual

7.6.3 IUP Monitoring Procedure

1) Insert IUPC using the procedure described in section 7.6.2 Directions for Use of IUPC.
2) Connect the IUPC to the IUP cable.
3) Connect the IUP cable to the connecting cable. (They might have already been well
connected in the package.)
4) Plug the connecting cable to the TOCO/IUP socket of the monitor.
5) Momentarily pressing the re-zero button on the IUP cable. The green light on the cable
will flash for five seconds. During this period, zero the monitor by pressing the AUTO
ZERO key. Make sure the display numeric and trace are both "0".
6) Ask the mother to cough. A spike on the trace in response to the cough indicates proper
positioning and function of the IUPC.
7) Wash timely during monitoring. A spike on the tracing will respond to the washing.

7.6.4 Checking Intrauterine Pressure Cable Function

To test an IUP cable's function:
1) Disconnect the catheter from the cable. Insert the cable check plug into the catheter end
of the cable.
2) Verify that the green light is continuously lit (no flashing).
3) If the light does not illuminate, replace the cable.
NOTE:
1 If the light is flashing, verify that the cable check plug is inserted completely into the
cable.
2 The cable test function is not intended to check the accuracy of the system, only to
confirm cable function.
Figure 7-12 Connect catheter to pressure cable
Figure 7-13 Test the pressure cable
- 68 -
Fetal Monitoring

Advertisement

Table of Contents
loading

This manual is also suitable for:

F9 expressF9

Table of Contents