Needle Height; Adjusting The Timing Of The Retainer Looper; Position Of The Retainer Looper - KANSAI SPECIAL DFB1404P Instruction

Industrial sewing machines dfb series
Hide thumbs Also See for DFB1404P:
Table of Contents

Advertisement

6 6 6 6 - - - - 4 Needle height

4 Needle height
4 Needle height
4 Needle height
When the needle bar is at the top of its stroke, remove plug A on the side cover plate,
loosen screw C on needle bar clamp B with a hexagonal wrench and then move the
needle bar up or down as required.
< Standard needle bar height D >
Stroke
34mm
< Note >
After the above adjustment is made, check to make sure each needle drops correctly into the
center of each needle drop hole.
【7】ADJUSTING THE TIMING OF THE RETAINER LOOPER

7 7 7 7 - - - - 1 Position of the retainer looper

1 Position of the retainer looper
1 Position of the retainer looper
1 Position of the retainer looper
Install retainer looper A so that its flat surface is
turned upward.
clearance of 0.5mm between the needle and the point
of the retainer looper.
loosening
B.
Standard model
13.5mm
At this time, there should be a
Adjustment is made by
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents