Applicant: Motorola Solutions
Figure 170: Site Controller - Captive Screws
6 Use the handle, and gently slide the Site Controller from the slot, removing it from the chassis.
7 Remove the Site Controller cover. Unscrew 19 screws securing the cover and slide it off gently to avoid damage
to components installed on the board (the cover can harm the springs on the RJ45 connectors (front side
connectors), when the cover has been slid nearly completely off).
8 Remove the old battery from the socket on the board.
Figure 171: Site Controller - Lithium Battery Location
9 Install a replacement battery (Motorola p/n 5185151Y02) in its socket on the board.
10 Slide the cover gently on and secure it with 19 screws.
11 Install the Site Controller into the MTS. Use the handle to slide the unit into the chassis.
Important: There are cables connected at the rear of the Site Controller. Slide out the Site Controller
carefully, tag and disconnect ribbon cables at the rear.
Important: Dispose or recycle the used battery according to local regulations.
Equipment Type: ABZ89FC5827 / 109AB-5827
6802800U74-AD | September 2014 |
Site Controller | 277
Send Feedback
Exhibit D2