ZC702 Evaluation Kit Built-In Self-Test

Introduction

The BIST tests many of the features offered by the ZC702 evaluation kit. The test is stored in
the onboard nonvolatile Quad SPI flash memory and configures the AP SoC when mode
switch SW16 is set to where SW1, 2, 3, and 5 are switched to the right and SW4 is switched
to the left, indicating QSPI configuration. This exercise of running the BIST demonstration
should take approximately 10 to 15 minutes.
For a description of all the features on the ZC702 board, see UG850, ZC702 Evaluation Board
Note:
for the Zynq-7000 XC7Z020 All Programmable SoC User Guide.

BIST Setup Requirements

These are the prerequisites for running the BIST demonstration.
Hardware setup:
ZC702 evaluation board with XC7Z020 CLG484-1 part
°
USB Type-A to Mini-B cable (for UART)
°
AC power adapter (12 VDC)
°
Windows software and driver setup:
Tera Term Pro
°
USB-UART driver from Silicon Labs
°
ZC702 and ZVIK Getting Started Guide
UG926 (v3.0.1) February 12, 2013
[Ref 8]
(or similar) terminal program (might already be installed)
[Ref 9]
www.xilinx.com
(might already be installed)