5.2 PRODUCT SETUP
The DNP / IEC 60870-5-104 point lists always begin with point 0 and end at the first "Off" value. Since DNP /
IEC 60870-5-104 point lists must be in one continuous block, any points assigned after the first "Off" point
NOTE
are ignored.
Changes to the DNP / IEC 60870-5-104 point lists will not take effect until the T60 is restarted.
NOTE
g) IEC 61850 PROTOCOL
PATH: SETTINGS
PRODUCT SETUP
IEC 61850 PROTOCOL
5
The T60 Transformer Protection System is provided with optional IEC 61850 communications capability.
This feature is specified as a software option at the time of ordering. Refer to the Ordering section of chap-
ter 2 for additional details. The IEC 61850 protocol features are not available if CPU type E is ordered.
The T60 supports the Manufacturing Message Specification (MMS) protocol as specified by IEC 61850. MMS is supported
over two protocol stacks: TCP/IP over ethernet and TP4/CLNP (OSI) over ethernet. The T60 operates as an IEC 61850
server. The Remote inputs and outputs section in this chapter describe the peer-to-peer GSSE/GOOSE message scheme.
The GSSE/GOOSE configuration main menu is divided into two areas: transmission and reception.
PATH: SETTINGS
PRODUCT SETUP
GSSE / GOOSE
CONFIGURATION
The main transmission menu is shown below:
5-22
COMMUNICATIONS
GSSE / GOOSE
CONFIGURATION
SERVER
MESSAGE
CONFIGURATION
IEC 61850 LOGICAL
MESSAGE
NODE NAME PREFIXES
MMXU DEADBANDS
MESSAGE
GGIO1 STATUS
MESSAGE
CONFIGURATION
GGIO2 CONTROL
MESSAGE
CONFIGURATION
GGIO4 ANALOG
MESSAGE
CONFIGURATION
GGIO5 UINTEGER
MESSAGE
CONFIGURATION
REPORT CONTROL
MESSAGE
CONFIGURATION
XCBR
MESSAGE
CONFIGURATION
XSWI
MESSAGE
CONFIGURATION
COMMUNICATIONS
TRANSMISSION
RECEPTION
MESSAGE
T60 Transformer Protection System
IEC 61850 PROTOCOL
IEC 61850 PROTOCOL
GSSE/GOOSE CONFIGURATION
5 SETTINGS
GE Multilin

Advertisement

Table of Contents
loading

Table of Contents