Starting Motor Service Test Specifications; Installation Of Battery - Piper ARROW III Service Manual

Table of Contents

Advertisement

TABLE XI-III. STARTING MOTOR SERVICE TEST SPECIFICATIONS
Aircraft Model
Motor Model
Min. Brush Tension
Max. Brush Tension
No-Load Test
Volt
Max. Amps
Min. RPM
Stall Torque
Amps
Min. Torque, Ft.-Lbs.
Approx. Volts
Pinion Position*
Drive at Rest
Drive Extended
*This dimension is measured from the centerline of the mounting hole nearest the drive end head to
the edge of the pinion.

11-67. INSTALLATION OF BATTERY.

a. Ascertain that the battery and battery box have been cleaned and are free of acid.
b. Install the battery in box.
c. Connect the positive lead to the positive battery terminal and secure.
d. Connect the ground cable to the negative battery terminal and secure.
e. Install the battery box cover and secure with wing nuts.
f. Install access panel.
11-68. CHARGING BAT T E RY. If the battery is not up to normal charge, remove the battery and recharg e
starting with a charging rate of 4-amps and finishing with 2-amps. A fast charge is not recommended.
Revised: 2/13/89
CHEROKEE ARROW III SERVICE MANUAL
PA-28R-201
MZ4206
32 oz.
40 oz.
(77°F)
10
75
2000
560
38.0
4.0
1.748 in. to 1.855 in.
2.388 in. to 2.495 in.
2I3
PA-28R-201T
MCL-6501
32 oz.
40 oz.
(75°F)
6
65
4900
410
8
2.0
ELECTRICAL SYSTEM

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Turbo arrow iii

Table of Contents