Power Plant Turbocharged Continental - Piper ARROW III Service Manual

Table of Contents

Advertisement

When servicing or inspecting vendor equipment installed in Piper Aircraft,
it is the user's responsibility to refer to the applicable vendor publication.
8-1. INTRODUCTION. The purpose of this section is to provide instructions for the removal, minor repair,
service and installation of the engine and components. For instructions on major repairs and overhauls, consult
the appropriate publication of the component manufacturer.
8-la. STANDARD PRACTICES - ENGINE. The following suggestions should be applied wherever they are
needed when working on the power plant.
1. To ensure proper reinstallation and/or assembly, tag and mark all parts, clips, and brackets as to their
location prior to their removal and/or disassembly.
2. During removal of various tubes or engine parts, inspect them for indications of scoring, burning or
other undesirable conditions. To facilitate reinstallation, observe the location of each part during
removal. Tag any unserviceable part and/or units for investigation and possible repair.
3. Extreme care must be taken to prevent foreign mater from entering the engine, such as lockwire,
washers, nuts, dirt, dust, etc. This precaution applies whenever work is done on the engine, either on or
off the aircraft. Suitable protective caps, plugs, and covers must be used to protect all openings as they
are exposed.
Dust caps used to protect open lines must always be installed OVER the tube
ends and NOT IN the tube ends. Flow through the lines may be blocked off if
lines are inadvertently installed with dust caps in the tube ends.
4. Should any items be dropped into the engine, the assembly process must stop and the item removed,
even though this may require considerable time and labor. Ensure that all parts are thoroughly clean
before assembling.
5. Never reuse any lockwire, lockwashers, tablocks, tabwashers or cotter pins. All lockwire and cotter
pins must fit snugly in holes drilled in studs and bolts for locking purposes. Cotter pins should be
installed so the head fits into the castellation of the nut, and unless otherwise specified, bend one end
of the pin back over the stud or bolt and the other end down flat against the nut. Use only corrosion
resistant steel lockwire and/or cotter pins. Bushing plugs shall be lockwired to the assembly base or
case. Do not lockwire the plug to the bushings.
6. All gaskets, packings and rubber parts must be replaced with new items of the same type at
reassembly. Ensure the new nonmetallic parts being installed show no sign of having deteriorated in
storage.
7. When installing engine parts which require the use of a hammer to facilitate assembly or installation,
use only a plastic or rawhide hammer.
8. Anti-seize lubrication should be applied to all loose-fit spline drives which are external to the engine
and have no other means of lubrication. For certain assembly procedures, molybdenum disulfide in
either paste or powdered form mixed with engine oil or grease may be used.
Ensure that anti-seize compounds are applied in thin even coats and that excess
compound is completely removed to avoid contamination of adjacent parts.
Revised: 2/13/89
CHEROKEE ARROW III SERVICE MANUAL
SECTION VIII
POWER PLANT
TURBOCHARGED
CONTINENTAL
(PA-28R-201T)
WARNING
CAUTION
NOTE
POWER PLANT - CONTINENTAL
2A11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Turbo arrow iii

Table of Contents