D
5180483-100, R
IRECTION
7-5-12-27
Transmit/Receive
.
Table 7-39
Line
1
Line
1
7-5-12-28
Back End Tests
Back End test includes tests on devices inside the BEP.
7-5-12-29
Power test includes tests on the Transmit Power Supply and the EPS
NOTE:
No Changes for MRX Configurations. Same tests found in R2.0.4 or later. See:
"Diagnostics - BEP" on page
PROPRIETARY TO GE
. 7
EV
Transmit/Receive
Name:
Description:
Transmit and Receive
Channel Test. Transmits on
T/R Channel Test
one at a time and received on
one channel at a time using an
open probe connector.
Table 7-40
Transmit/Receive - Board Tested/Required Matrix for Diagnostics
"GTX
GRLY
MRX
(slot2)
T
T
T
7-112.
Figure 7-75 Back End Tests - MRX
Chapter 7 Diagnostics/Troubleshooting
Run Time:
00:03
FRU - T = Tested / R = Required
"GTX
"GTX
(slot3)"
(slot4)"
PD
Processor
T
T
R
LOGIQ E9 P
ROPRIETARY
If this test failed:
1.) Swap front-plane boards to determine if the
failure point changes as the boards are moved.
Replace Front Plane is determined to be failing.
2.) Swap GTX boards around to check if the failure
follows one of the boards. Replace if determined to
be failing.
3.) Replace GRLY.
4.) Replace the MRX Board.
"Front
Plane
Upper
FREY
Back End
and
Back
Plane
Lower"
R
R
R
S
M
ERVICE
ANUAL
"Main
"Fan
Power
Tray"
Supply"
R
7-5-14
7 - 109