Average Setup Time; Setup Warnings; Setup Reminders - GE LOGIQ E9 Service Manual

Hide thumbs Also See for LOGIQ E9:
Table of Contents

Advertisement

D
5180483-100, R
IRECTION
Section 3-2

Setup reminders

3-2-1

Average setup time

Table 3-1
DICOM NETWORK CONFIGURATION
3-2-2

Setup warnings

WHEN USING ANY TEST INSTRUMENT THAT IS CAPABLE OF OPENING THE
DANGER
AC GROUND LINE (I.E., METER'S GROUND SWITCH IS OPEN), DON'T TOUCH
THE UNIT!
TO PREVENT ELECTRICAL SHOCK, CONNECT THE UNIT TO A PROPERLY GROUNDED
CAUTION
POWER OUTLET. DO NOT USE A THREE TO TWO PRONG ADAPTER. THIS DEFEATS SAFETY
GROUNDING.
DO NOT WEAR THE ESD WRIST STRAP WHEN YOU WORK ON LIVE CIRCUITS AND MORE
CAUTION
THAN 30 V PEAK IS PRESENT.
DO NOT OPERATE THIS UNIT UNLESS ALL BOARD COVERS AND FRAME PANELS ARE
CAUTION
SECURELY IN PLACE. LOGIQ E9 PERFORMANCE AND COOLING REQUIRE THIS.
NEVER REVERSE POLARITY ON ANY METER THAT INTERCEPTS THE POWER CORD WITH
NOTICE
POWER CONNECTED TO THE SYSTEM.
EVEN IN THE OFF STATE, REVERSING POLARITY ON THE POWER CAN SERIOUSLY DAMAGE
THE POWER SUPPLY.
If the unit is very cold or hot, allow the temperature of the device to stabilize before powering up. The
following table describes guidelines for reaching operational temperatures from storage or transport
temperatures. See:
3 - 2
. 7
EV
Average setup time
DESCRIPTION
UNPACKING THE LOGIQ E9
SET UP LOGIQ E9 WO/OPTIONS
INSTALL INSITE / ILINK
2-2-2 "Console environmental requirements" on page
Section 3-2 - Setup reminders
PROPRIETARY TO GE
AVERAGE SETUP
TIME
0.5 HOUR
4 HOURS
2 HOURS OR MORE
0.5 HOUR
LOGIQ E9 P
ROPRIETARY
COMMENTS
DEPENDENT ON THE CONFIGURATION
DEPENDENT ON THE CONFIGURATION
2-2.
S
M
ERVICE
ANUAL

Advertisement

Table of Contents
loading

Table of Contents