Allocate Power Supply Modules (Dulcomarin ® Ii Dulco-Net) - ProMinent DULCOMARIN II Assembly And Installation Manual

Multi-channel measuring and control system/swimming pool controller and disinfection controller dxca
Table of Contents

Advertisement

Planning aids and requirements for the installation site
4.3 Allocate power supply modules (DULCOMARIN
Locate the power supply module in
the CAN bus backbone (main line)
(DULCOMARIN
®
II DULCO-Net)
The central unit always contains a power supply module.
Number of pools
1
2
3
4
5
6
7
8
Divide the number of pools by
2)
18
1.
Determine the requirement for power supply modules, see
Ä Chapter 4.3 'Allocate power supply modules (DULCO‐
MARIN® II DULCO-Net)' on page 18
2.
Determine the requirement for connection cables between
the external modules
3.
Determine the requirement for holding clamps for the con‐
nection cables (ASV pipe clips, 16 mm, order no. 359904
Determine the number of additionally required power supply mod‐
ules (N modules and P modules).
1.
Ensure that for each power supply module there is a power
outlet
2.
Distribute the power supply modules as uniformly as possible
over the CAN bus line.
3.
With an A module with connected plotters: arrange one of the
power supply modules as close as possible to the A module
Additional N- or P-mod‐
ules
-
-
1
2
2
3
3
4
'2' . If a remainder is obtained, round down: (Exception: number of pools =
II DULCO-Net)
®
The distance between the power supply modules
should not exceed 50 m.
Number of pools
9
10
11
12
13
14
15
16
Additional N- or P-mod‐
ules
4
5
5
6
6
7
7
8

Advertisement

Table of Contents
loading

Table of Contents