5 Commissioning

The interfaces for the device are located under protective covers. It has to be removed in order
to connect the power supply lead and the interface cables.
All supply leads and all required data leads have to be connected before commissioning.
ATTENTION
The device must be switched off before
connecting or disconnecting any cables in
order to prevent damage to the electronics!
The device may only be switched on after
acclimatising to the ambient temperature in
order to avoid condensate accumulation.
Make sure to meet the permissible voltage
for this device.
After switching off and before switching on
you must wait for at least 5 seconds.
Information:
The shielding of a data cable must always be connected with the connector
housing (EMC).
For embedded operating systems, the interfaces must be explicitly
enabled and the necessary drivers installed in order to use them.