5.3 Cable installation

The interfaces and the device power supply plug are located at the bottom of the device.

5.4 Order of steps during commissioning

•24V DC device: insert cable for power supply with cable end sleeves into terminals
•Connect cable for serial / parallel data transmission and fasten the plugs to the sockets
•Plug in all other required cables and secure against slipping out.
Pos : 19 /D atentec hni k/Inbetri ebnahme/Betriebsberei tschaft prüfen/Betriebsbereitschaft prüfen für OPC/C PC/PLC /OTC /ITC/VMT-Serie(+Monitore) / IPC 5100/5500/2400/1100 @ 0\mod_1158905578361_6.doc @ 381 @

5.5 Check for operational readiness

Check the device for hidden damages caused by improper transport, incorrect
operation/storage conditions or improper use (e.g., smoke emissions from the device, etc.). If
damages are found, immediately shut down the device and protect it against unintentional
startup.