4.12 Order of installation (OPC8013-8022)

ACHTUNG
The screws have to be tighten with a torque
of 0.25 NM
Information:
The connection to the power supply network is established via the
included power cable or lead-through terminal with screw connection.
No earthing connection needs to be established as earthing takes
place via the protective earth of the device plug / power supply
connection. In the event of additional earthing on the earthing screw,
use wire cross section with at least 2.5 mm².