B) MEASUREMENT MENU (Figure 4-6 and Figure 4-7)
This screen shows details of measured values. Input and Output values are displayed. During Battery
operation, remaining battery power and Run time are also displayed.

Figure 4-6 Input Values

Figure 4-7 Output values

C) OPERATION MENU (Error! Reference source not found.Figure 4-8)
This screen prompts the user to select: (a) whether the start & stop operation will be performed by local
or remote operation; (b) date & time adjustment; (c) battery equalizing charge. The battery equalizing
charge operation key will appear when battery equalizing charge is set up (Setup is based on battery
type).
Figure 4-8 Remote/Local operation and Date & Time adjustment select
D) LOG MENU (Figure 4-9 to Figure 4-11)
This LOG MENU displays two Touch icons in EVENT LOG and BATTERY LOG.
Pressing the EVENT LOG icon will display up to 50 condition/operation records. Press ▲ or ▼ button
for turning pages.
Press the BATTERY LOG icon to display the Number of battery operations and Summed (Total) battery
operation time.