NetSure
Control Unit (NCU)
User Manual, UM1M830BNA
b.
Verify that the NCU power system lowers its output
voltage by the value of the programmed "DELTA
VOLTAGE".
c.
Verify that the rectifiers in the existing power system
take the additional load as the load increases pass
the "POWER SPLIT CURRENT LIMIT" value.
d.
Further increase the load in order to exceed the total
capacity of the rectifiers in the existing power
system (or shut down some of the rectifiers in the
existing power system if the capacity of the external
dry load bank is not sufficient). Verify that the NCU
power system starts taking the additional load as
soon as the total capacity of the rectifiers in the
existing power system is exceeded.
2.
In a Power Split application where the NCU power system
is taking only part of the load (operating continuously at
the current level equivalent to the programmed "POWER
SPLIT CURRENT LIMIT" percentage) and the rectifiers in
the existing power system are taking the rest of the load,
use an external dry load bank of sufficient capacity to
increase the load in order to exceed the total capacity of
the rectifiers in the existing power system (or shut down
some of the rectifiers in the existing power system if the
capacity of the external dry load bank is not sufficient).
a.
Verify that the NCU power system starts taking the
additional load as soon as the total capacity of the
rectifiers in the existing power system is exceeded.

FIAMM SoNick (Sodium Nickel) Batteries Interface

If a special configuration file is furnished, the NCU has capability to
receive status information sent from FIAMM SoNick (Sodium
Nickel) batteries. Refer to the following for FIAMM SoNick (Sodium
Nickel) battery interface notes.

FIAMM BATTERY INSTALLATION AND USER INSTRUCTIONS

The following instructions apply only when FIAMM 48TL200
batteries are used in a NetSure 721 Power System equipped with
an NCU FIAMM battery interface configuration.
Notes:
NCU FIAMM battery configuration cannot be used with,
or mixed with, batteries of other manufacturing types.
A specific FIAMM NCU configuration is required in order
for the controller to actively display FIAMM battery
monitoring parameters.
Spec. No: 1M830BNA, 1M830DNA
Model No: M830B, M830D

Required FIAMM Documentation

The following FIAMM instructional documentation is to be
obtained directly from FIAMM.
Note that the following instructions were developed using the
FIAMM documents and corresponding revision level as listed
below.
FIAMM Technical Manual, 'Installation & Operating
Instructions_48TL200_12-2014'
FIAMM Technical Bulletin, '48TL200 Modbus Protocol',
(Revision 5, Issue Date 21/05/2012)
FIAMM User Manual, '48TL200 SMC Monitor', (Revision 0,
Issue Date 27/08/2012)
FIAMM Technical Bulletin, 'SMC Battery Software
Interface', (Revision 0.0, Issue Date 3-2014)

FIAMM Battery SMCMonitor200 Software

Installation and monitoring instructions of the FIAMM batteries
using FIAMM SMCMonitor200. Software is located in the FIAMM
Technical Bulletin, 'SMC Battery Software Interface', (Revision 0.0,
Issue Date 3-2014). Contact FIAMM for any questions regarding
the SMCMonitor200 operation.
NOTE: FIAMM SMCMonitor200 software is used exclusively to
directly monitor FIAMM batteries via a User's computer. The
monitoring software has no application with the NCU
Controller.
Following software is required for SMCMonitor200 communication
for the User's computer, and is available from FIAMM.
Virtual Com-Port Driver Installation
SMCMonitor200 1.5.3 Software Folder,
Containing Folders: Backup, Config, Log, XML
o
Containing Files: SMC Battery Software
o
Interface_So-Nick-48TL200.pdf;
SMCMonitor200.exe
Installation Requirements for NCU Monitoring of FIAMM
Battery(s)
The setup installation for monitoring of FIAMM batteries using the
Vertiv NCU requires the following procedures.
1.
Install RS485 conductors in parallel between the NetSure
721 and each of the FIAMM batteries.
2.
Change the Modbus address on each of the FIAMM
batteries.
[36]
Code: UM1M830BNA
Revision M, May 12, 2017

Hide quick links: