Figure 17. Removing the battery retaining bracket
1
Bolts
2
Nut
3
Battery retaining bracket
d. Grip the tab on the front of the battery and pull the battery forward until it
can be accessed by two service representatives.
e. With the assistance of another service representative, lift the battery
assembly clear of the UPS 5125 and place to one side.
Note: The front cover for the UPS 5125 is not installed, however, it is
included inside of the shipping carton. You will install the front cover
later in the installation process.
2. With the assistance of another service representative, lift the UPS 5125 clear
of the shipping carton and place it on a flat, stable surface.
3. Remove the two screws
4. Pull the electronics assembly
See Figure 18 on page 44.
Chapter 3. Installing the uninterruptible power supply and the SAN Volume Controller
1
. See Figure 18 on page 44.
2
out of the UPS 5125, and put it to one side.
43

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TotalStorage SAN Volume Controller and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents