7.IO-Link Connection Procedure
4
The Transfer from PLC Dialog
Box is displayed. Select IO
Table and SIO Unit Parameters.
Click Transfer.
When the transfer is completed,
the Transfer Results Dialog Box
is displayed.
Check that the transfer is
successfully completed by
referring to the message in the
dialog box.
When the I/O table is created
normally, the dialog box displays
as follows:
Transfer Success: 1 Unit
Transfer Unsuccessful: 0 Unit
Click OK.
32