Omron CJ2-CPU Connection Manual page 16

E3z-series io-link photoelectric sensor
Hide thumbs Also See for CJ2-CPU:
Table of Contents

Advertisement

7.4. Network Settings for Host
Communications
7.4.1. Starting Network Configurator
and Connecting Online with
PLC
7.4.2. Uploading the Network
Configuration
7.4.3. Setting the Tags
7.4.4. Setting the Connections
7.4.5. Transferring the Tag Data Link
Parameters
7.5. IO-Link Communication Status
Check
7.5.1. Checking the Connection Status
7.5.2. Checking the Receive Data
7.IO-Link Connection Procedure
Set the EtherNet/IP tag data links.
Start Network Configurator and connect online with
PLC.
Upload the network configuration.
Register tags for input (consume) and output
(produce).
Associate the tags of the target device with the
tags of the originator device.
Transfer the set tag data link parameters to PLC.
Confirm that cyclic communications in the IO-Link
system performs normally.
Check the connection status of each device.
Check that the correct data are received.
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents