Site Installation Diagrams - Motorola PTP 48600 User Manual

Ptp 600 series
Hide thumbs Also See for PTP 48600:
Table of Contents

Advertisement

Site installation diagrams

Site installation diagrams
This section contains diagrams to show how the components of PTP 600 sites are
installed and connected with LPU. The diagrams cover the following configurations:
Typical mast or tower installation
Typical wall installation
Mast or tower installation with E1/T1
Wall installation with E1/T1
Mast or tower installation with GPS Sync Unit
Wall installation with GPS Sync Unit
Mast or tower installation with GPS Sync Unit and E1/T1
Wall installation with GPS Sync Unit and E1/T1
The recommended standard components for protecting installations are:
The supported Superior Essex cable
Surge arrestor, type PTP-LPU: 4 or 8 per link (2 or 4 Motorola Kits Part Number
WB2907AA)
Grounding stake
Grounding cable: minimum size 8 AWG, preferably 6 or 4 AWG
RJ45 screened connectors
Additional components are listed under each diagram where required. The
recommended cables are specified in
There may be a local regulatory requirement to cross bond the CAT 5e cable to the
mast or tower at intervals as regular as every 10 metres (33 feet). This can be
achieved using an Andrew grounding assembly type 223158 or similar.
NOTE
Where an installation already has, or requires the use of a Master Ground Bar then the
requirements of
COMMUNICATION SITES (68P81089E50)
2-26
Refer to instructions contained in the Andrew grounding kit for correct
installation, or if instructions are missing, refer to:
http://awapps.commscope.com/catalog/product_details.aspx?id=15832&tab
=2
Motorola Specification R56: STANDARDS AND GUIDELINES FOR
UNDER DEVELOPMENT
Chapter 2 Planning considerations
Cables and connectors
take precedence over those in this guide.
on page 1-15.
phn-0896_009v003
Feb 2010

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ptp 25600Ptp 45600Ptp 49600Ptp 54600Ptp 58600Ptp 59600

Table of Contents