B-ALU Extern 180 Instructions For Installation And Use Manual page 50

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 42
3.5. Place the rear roller rail in position
STEP
1
Mark boreholes on the foundation (position in accordance with the foundation plan). Use the
base plate as a stencil. Remove the rear roller rail and make the boreholes using an 18 mm drill
bit.
1. Clean the boreholes with a brush. Take care to ensure that all residues of dust and dirt have
been removed.
2. Insert resin capsules.
2
STEP
Insert the threaded rods and allow the resin anchor to cure in accordance with the specification.
Put washers and nuts in place on the rear roller rail and tighten them by hand.
3
STEP
Adjust the rear roller rail. While opening, the rear roller rail should not touch the gate.
ATTENTION! The gate should not run under pressure on the rear roller rail! The gate may get
damaged otherwise.
Adjust the height of the rear roller rail by turning the nuts. Tighten the nuts with a spanner.
3.6. Electrical installation
3.6.1.
General
ATTENTION! This installation work must be carried out by a qualified and specialized electrician in accordance with the legal rules
and regulations applicable.
CAUTION! Crushing hazard and hazard caused by electric current!
ENGLISH
9

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Inline 160Inline 100Inline 120Inline 250

Table of Contents