System Configuration; Unpacking The Ups - Xtreme Power Conversion 20kVA Model User And Installation Manual

R91 online ups
Table of Contents

Advertisement

R91 User's Manual
perature, etc.
• EPO Function

System Configuration

The UPS device and the external batteries make up the system. Depending on the site and load requirements of
the installation, certain additional options are available for the solution.
Planning a UPS system, the following should be taken into consideration:
• The total demand of the protected system shall dictate the output power rating (VA). Allow a margin for
future expansion or calculation inaccuracies from measured power requirements.
• Backup time required will indicate the battery size needed. If the load is less than the UPS nominal power
rating, then actual backup time is longer.
• The following options are available:
o
Connectivity Options –SNMP/WEB card
o
Extended Battery Packs - minimum 1 required
See the Specification section of this manual for additional model information.

Unpacking the UPS

1. Do not lean the UPS against anything when moving it out of the packaging.
2. Check the physical appearance of the UPS to see if it was damaged during transportation. Do not switch on the
UPS if damage is found. Please contact your dealer or distributor immediately for assistance.
3. Check the accessories according to the packing list to assure that you have all required pieces.
Input Terminals
Parallel
Xtreme Power Conversion Corporation
R91-20K front view
Battery
Connection
RS485 /
SNMP
RS232
Maintain-AUXSWS
Port 1
R91-20KVA rear view diagram
Input
Breaker
EPO
Port
Uninterruptible Power Supply
Output Terminals
Parallel
Port 2
Page 8

Advertisement

Table of Contents
loading

Table of Contents