Before Taxiing
CAUTION
During ground operation, monitor battery
discharge rate by positioning voltammeter
selector to BAT.
Turn off nonessential
electrical loads if voltammeter indicates
discharge of the battery.
(1)
Air Conditioning Switch - AS DESIRED.
(2)
Blower Switch - AS DESIRED.
Before Takeoff
(1)
Air Conditioning Switch - OFF or VENTILATE.
After Takeoff
(1)
Air Conditioning Switch - AS DESIRED.
(2)
Blower Switch - AS DESIRED.
Before Landing
(1)
Air Conditioning Switch - OFF or VENTILATE.
After Landing
CAUTION
During ground operation, monitor battery
discharge rate by positioning voltammeter
selector to BAT.
Turn off nonessential
electrical loads if voltammeter indicates
discharge of the battery.
(1)
Air Conditioning Switch - AS DESIRED.
(2)
Blower Switch - AS DESIRED.
7-19