Adjustment Flow Chart After A/C Head Replacement - Panasonic AJ-D400P Service Manual

Dvcpro series camera recorder
Table of Contents

Advertisement

Note: After
installing,
Adjustments should be performed.
The hex screw (B) is kept loose until the A/C
Head Height Adjustment is completed.
Fig. 10-2-2 Connection of A/C Head
A/C Head Side
Cable Color
1
PINK
2
WHITE
3
PINK
4
WHITE
5
PINK
6
WHITE
7
WHITE YELLOW
8
BLACK
Mechanical
and
Electrical
Connector No.
YELLOW
RED
P1003
GREEN
P600
10-2-2. Adjustment Flowchart After A/C
Head Replacement
1.
After replacing the A/C Head, perform the
following steps.
(Section 3)
A/C HEAD TILT ADJUSTMENT
A/C HEAD HEIGHT ADJUSTMENT
A/C HEAD AZIMUTH ADJUSTMENT
X VALUE ADJUSTMENT
LISTA ADJUSTMENT PROCEDURE
(ITEM 1-31 to 1-36)
(Section 4)
PG SHIFTER ADJUSTMENT
CUE RECORDING LEVEL ADJUSTMENT
CUE REC CURRENT ADJUSTMENT
START
END

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aj-d400pe

Table of Contents