Maintenance Parts; Maintenance Schedule - Panasonic AJ-D400P Service Manual

Dvcpro series camera recorder
Table of Contents

Advertisement

1. Maintenance Parts

1-1. Maintenance Schedule

No.
Name
Tape Path Cleaning
1
Cylinder Unit
2
Pinch Arm Unit
3
Cleaning Arm Unit
4
S Reel (Rotor Unit)
5
T Reel (Rotor Unit)
6
S Brake Arm Unit
7
T Brake Arm Unit
8
Thrust Screw Unit
9
Mech Chassis Unit
10
1.5" CRT(EVF)
Note:
Hours of Use are based on the head rotation hours.
Hours of Use are recommendation. It may depend on temperature, humidity or dusty.
Hours of Use are listed as the reference of maintenance. They do not mean guarantee hours.
Symbol
Maintenance
!
Replacement
"
Replacement
#
Greasing
Cleaning
$
Lubrication
Part Number
2,000
!
VEG1498
VXL2835
!
VXL2924
VEM0629
VEM0630
VXL2705
VXL2706
VXQ0556
VXY1308
M04KYS07WB Replace the CRT at each 5,000 hours Operation Time.
These parts included in Mech Chassis Unit
Wipe the old grease and apply new grease
This mark means cleaning is necessary
The lubrication is necessary
Using Hours (hrs)
4,000
6,000
∆Clean the Tape Path at each 500 hours
!
!
!#
!
!
!
!
!
!
!$
Remark
8,000
10,000
12,000
!
!
"
!#
"
!
!
"
"
"
"
"
"
!

Advertisement

Table of Contents
loading

This manual is also suitable for:

Aj-d400pe

Table of Contents