4-Installation And Assembly - RED COMPACT 35 Installation And User Manual

Pellet boiler
Hide thumbs Also See for COMPACT 35:
Table of Contents

Advertisement

4-INSTALLATION AND ASSEMBLY

PREPARATION AND UNPACKING
The Compact boiler is supplied complete with all its electrical and mechanical components and factory-tested:
Open the package and remove the two screws between the bracket and the boiler and the two screws that fasten the bracket to the pallet.
Set the boiler in the pre-selected place, making sure this complies with the requirements. The boiler body or unit must always be kept in a
vertical position when handled and moved by using carts only. Pay particular attention that the door is protected from mechanical knocks
that would compromise its integrity.
FIGURE 1 - REMOVING THE PACKAGE SCREWS
Always handle the products with care. If possible, unpack the boiler near the chosen place of installation. The materials that make up the
packaging are neither toxic nor harmful, and so require no particular disposal measures.
The product, as shown in figure 2, is equipped with a hook to ease handling. To use the hook it is necessary to lift the front cover, unscrew
the rod that is used to clean the pipe unit, take the bar for handling (supplied with the boiler) and insert it in the hooks arranged on the
boiler; at this point it is possible to use the hook for handling.
Once the package has been removed make sure that the boiler is complete and not damaged, in case of doubt contact the retailer.
The product packaging contains the following documents:
System booklet
Instructions booklet
Annex G - Technical inspection report for heat system with heat output below 35 kW.
Warranty
20
BAR FOR HANDLING
FIGURE 2 - HOOK FOR HANDLING
CLEANING ROD

Advertisement

Table of Contents
loading

Table of Contents