Installing The Erm As A Tower; Rotating The Logo Badge - HPE R/T3000 G2 User Manual

Table of Contents

Advertisement

Installing the ERM as a tower

Before installing the unit, review and adhere to all warnings provided in "Precautions (on page 12)."
The tower stands and associated hardware ship with the UPS.

Rotating the logo badge

Gently pull out the logo badge, rotate it 90 degrees, and then replace it in the bezel.
Installation 34

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents