4. CONNECTING PIPING WORK
1. Restrictions on unit installation
Abide by the following restrictions on unit installation.
Improper installation can cause compressor failure or performance degradation.
Model SCM40/45
one indoor unit MAX 25m
piping length
all indoor unit MAX 30m
MAX 15m
hight difference
outdoor
MAX
unit
25m
MAX 15m
2. Preparation of connecting pipe
2.1. Selecting connecting pipe
Select connecting pipe according to the following table.
Indoor unit
Model 20/25/35
Gas pipe
ø9.52
Liquid pipe
ø6.35
• Pipe wall thickness must be greater than or equal to 0.8 mm.
• Pipe material must be O-type (Phosphorus deoxidized seamless copper pipe ICS 23.040.15, ICS
77.150.30).
2.2. Cutting connecting pipe
(1) Cut the connecting pipe to the required length with pipe cutter.
(2) Hold the pipe downward and remove the burrs. Make sure that no foreign material enters the pipe.
(3) Cover the connecting pipe ends with the tape.
3. Piping work
Check that both liquid and gas operation valves are fully closed.
Carry out the piping work with operation valves fully closed.
3.1. Flaring pipe
(1) <SCM40/45>
Take out flare nuts from the service valves of outdoor unit and engage them onto connecting pipes.
<SCM50/60>
Take out flare nuts from the service valves of outdoor unit.
If a 5.0, 6.0 kw class indoor unit (gas side pipe 12.7) is going to be connected to the service valves
(9.52), variable joints available as accessories must be applied to the gas side service valves.
Securely fit the copper packing between the service valve and the variable diameter joint to
prevent shifting.
Engage flare nuts onto connecting pipes.
Liquid side service valve ( 6.35)
6.35 pipe
Service
valve
Gas side service
valve ( 9.52)
Variable diameter joint
Copper packing
(
(2) Flare the pipes according to table and figure shown below.
Flare dimensions for R410A are different from those for conventional refrigerant.
Although it is recommended to use the flaring tools designed specifically for R410A, conventional flaring
tools can also be used by adjusting the measurement of protrusion B with a flare adjustment gauge.
A
Copper pipe
0
A
outer diameter
–0.4
ø6.35
9.1
ø9.52
13.2
ø12.7
16.6
5. ELECTRICAL WIRING WORK
WARNING
• Make sure that all the electrical work is carried out in accordance with the national or regional electri-
cal standards.
• Make sure that the earth leakage breaker and circuit breaker of appropriate capacities are installed
(Refer to the table given below).
• Do not turn on the power until the electrical work is completed.
• Do not use a condensive capacitor for power factor improvement under any circumstances.
(It does not improve power factor. Moreover, it can cause an abnormal overheat accident).
Breaker specifications
Model
Phase
SCM40/45/50/60
Single phase
Main fuse specification
Model
Specification
SCM40/45/50
250V 15A
SCM60
250V 20A
1.Preparing cable
(1) Selecting cable
Select the power source cable and connecting cable in accordance with the specifications mentioned below.
(a) Power source cable
3-core* 4.0mm
2
or more, conformed with 60245 IEC57(CENELEC H05RN-F)
When selecting the power source cable length, make sure that voltage drop is less than 2%.
If the wire length gets longer, increase the wire diameter.
(b) Connecting cable
2
4-core* 1.5mm
, conformed with 60245 IEC57(CENELEC H05RN-F)
* 1 Earth wire is included (Yellow/Green).
Model SCM50/60
one indoor unit MAX 25m
all indoor unit MAX 40m
indoor
indoor
unit
unit
MAX 15m
indoor
outdoor
MAX
unit
unit
25m
MAX 15m
indoor
indoor
unit
unit
Model 50/60
ø12.7
ø6.35
Liquid service valve
Gas service valve
50,60 model
Indoor unit
12.7 pipe
9.52 -
12.7)
Rigid (clutch) type
Copper pipe
outer diameter
R410A
ø6.35
ø9.52
0-0.5
ø12.7
Earth leakage breaker
Circuit breaker
Leakage current: 30mA,
Over current: 25A
0.1sec or less
Parts No.
SSA564A136
SSA564A136A
3.2. Connecting pipes
(1) Connect pipes on both liquid and gas sides.
<SCM40/45>
Service valve
Service valve
(2) Tighten nuts to specified torque shown in the table below.
Service valve size (mm)
ø6.35 (1/4")
ø9.52 (3/8")
ø12.7 (1/2")
CAUTION
• Do not apply refrigerating machine oil to the flared surface. It can cause refrigerant leakage.
• Do not apply excess torque to the flared nuts. The flared nuts may crack resulting in refrigerant leakage.
4. Evacuation
(1) Connect vacuum pump to gauge manifold. Connect charge hose of gauge manifold to a service port
of outdoor unit.
(2) R un the vacuum pump for at least one hour after the vacuum gauge shows -0.1MPa (–76cm Hg).
(3) C onfirm that the vacuum gauge indicator does not rise even if the system is left for 15 minutes or more.
Vacuum gauge indicator will rise if the system has moisture left inside or has a leakage point.
Check the system for the leakage point. If leakage point is found, repair it and return to (1) again.
(4) Close the Handle Lo and stop the vacuum pump.
Keep this state for a few minutes to make sure that the compound pressure gauge pointer does not
swing back.
(5) Remove valve caps from liquid service valve and gas service valve.
(6) Turn the liquid service valve's rod 90 degree counterclockwise with a hexagonal wrench key to open
valve.
Close it after 5 seconds, and check for gas leakage.
U sing soapy water, check for gas leakage from indoor unit's flare and outdoor unit's flare and valve rods.
Wipe off all the water after completing the check.
(7) D isconnect charging hose from gas service valve's service port and fully open liquid and gas service
valves. (Do not attempt to turn valve rod beyond its stop.)
(8) T ighten service valve caps and service port cap to the specified torque shown in the table below.
Service valve size (mm)
ø6.35 (1/4")
ø9.52 (3/8")
ø12.7 (1/2")
(9) Repeat the above steps (1) to (8) for all connected indoor units.
Liquid service valve
Valve cap
Gas service valve
Service port
Conventional
CAUTION
• To prevent the entering of different oil into the refrigeration system, do not use tools designed for any
1.0-1.5
other refrigerant type (R22, R407C, etc.).
• To prevent vacuum pump oil from entering into the refrigerant system, use a counterflow prevention adapter.
(2) Arrange each wire length as shown below.
Make sure that each wire is stripped 10mm from the end.
<Power source cable>
30mm or more
40mm or more
Earth wire
(3) Attach round crimp-type terminal to each wire as shown in the below.
Select the size of round crimp-type terminal after considering the specifications of terminal block and wire
diameter.
10mm
CAUTION
Power source cable and connecting cable must conform to the specifications mentioned in the manual.
Using cables with wrong specifications may result in unit malfunction.
20
-
-
'16 • SCM-T-199
<SCM 50/60>
for room B
for room A
Tightening torque (N·m)
14-18
34-42
49-61
Do not hold the valve cap area with a spanner
Service valve cap tightening
Service port cap tightening
torque (N·m)
20-30
25-35
Compound pressure gauge
Handle Lo
Charge hose
<Connecting cable>
30mm or more
40mm or more
Earth wire
Round crimp-type terminal
Service valve
for room C
Service valve
for room B
Service valve
for room A
torque (N·m)
10-12
Pressure gauge
Gauge manifold
Handle Hi
Vacuum pump
<Wire end>
10mm
Sleeve

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents