Page 10 of 20
Before installation
Before installation ensure that the following have been
provided at the installation site
• Review of all the technical specifications.
• Ensure the under counter cupboard floor can support the product weight
when full of water (allow an extra 5kg when full).
• Sufficient space in the cupboard to install the Command-Centre
other components in accordance with these installation instructions. See
technical specification, page 9 for dimensions. See sections 3 to 4, pages
12 to 14 for installation instructions.
• For Zip HydroTap
®
13A socket will be required.
• The Command-Centre
regulations. See Technical specification, page 9 for power ratings.
Note
Check all cable and hose lengths against inlet /outlet positions before
proceeding (see sections 3 to 4, pages 12 to 15 for general layout).
• A potable water supply connection with isolating valve inside the
cupboard within reach of the braided hoses and positioned so that the
connection point and the stop cock will not be obstructed when the
Command-Centre
• A potable cold water supply with a minimum working pressure of:
(see page 9 min. / max. water supply pressure).
• If pressure is likely to exceed 0.7 MPa (7 bar), install a 0.35 MPa (3.5
bar) pressure limiting valve.
• The appliance must be placed with its base in a horizontal position.
IMPORTANT!
Do not proceed with the installation if these requirements are
not met.
804052UK - Residential chilled and sparkling installation instructions - Sept 2016 - v3.02
G4 Chilled and sparkling only models, 1 x 220-240V AC
must be installed in accordance with IEE
TM
is installed.
TM
and
TM
Need help?
Do you have a question about the Command-Centre and is the answer not in the manual?