Installation - EIP CD100E Owner's Manual

Industrial dehumidifier
Table of Contents

Advertisement

POSITIONING:
Position the dehumidifier unit in the center of the room to be conditioned if at
all possible. However if a damp patch is particularly apparent the outlet grille
should be pointed towards it.
NOTE: Both inlet grille and outlet grille of the dehumidifier unit must have
clear space around them and not be obstructed in anyway.
WIRING:
Connect the power cord of the dehumidifier to a suitable single phase, fused
power supply. As follows:-
ALARM WIRING:
DRAINAGE:
Connect a 15mm inside diameter hose to the condensate outlet pipe
(positioned centrally, beneath the air inlet grille). Secure the hose using a
worm drive clip. The hose should at no point be raised higher than the outlet
pipe. Failure to observe this requirement will result in flooding of the
dehumidifier unit. Ensure the draintube heater tape is inserted the full length
of the drain tube.
OPTIONAL:
The CD100 may also be fitted with a water pump capable of discharging the
condensate a vertical height of 30ft. The water can, therefore, be discharged
into a drain some distance away.

INSTALLATION

Brown
Blue
Green/Yellow
Plug L (Normally Open Contacts)
Plug N (Close on Humidity Rise)
Plug E (Earth)
Page 4 of 16
Live
Neutral
Earth (ground)
Drawing : - TPC262
Issue
: - 5
Date
: - 05/01/12

Advertisement

Table of Contents
loading

Table of Contents