Piping Installation Point - Daikin RXYQ5-48MAY1 Service Manual

R410a heat pump 50hz
Table of Contents

Advertisement

Piping Installation Point

5.

Piping Installation Point

5.1

Piping Installation Point

The projection part between multi connection piping kits
When the piping length between the multi connection kits or between multi connection kit and
outdoor unit is 2m or more, prepare a vertical projection part (200mm or more as shown below) only
on the gas pipe line location less than 2m from multi connection kit.
In the case of 2m or less
312
Less than 2m
V3037
Si39-407
Appendix

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents