Finishing The Installation; Charge The Battery While Finishing; Install And Wire Detection Devices; Install Modules And Relays - Radionics D9412G Operation And Installation Manual

Control/communicators
Table of Contents

Advertisement

Releasing the reset pin from the closed position resets the panel. The panel resets all its timers, counters,
indexes, and buffers. Any points that restore after a reset is performed will not generate restoral reports.
If the reset pin is placed in the disable position when all areas are armed, there must be an entry in the Answer
Armed program item. See RAM Parameters in the D9412G/D7412G Program Entry Guide .
Locking the pin in the disable position allows powering up the panel and charging the battery while the detection
devices and command centers are being installed.
3.6

Finishing the Installation

Earth ground and reset pin first: Make the earth ground connection to Terminal 10 and lock the reset pin in the
closed position if not already done.
3.6.1

Charge the Battery While Finishing

Connect the battery and then the transformer so that the panel can charge the battery while the installation is being
finished. See section 4.0 Power Supply section for instructions.
On-board Buzzer Sounds at Power Up and Reset: The system performs a series of self diagnostic tests of its
hardware, software, and program at power up and at reset. The buzzer on the panel sounds during the tests. The
self diagnostics take about 1-3 seconds to complete.
If the panel fails any of the tests, the buzzer continues sounding and a system trouble message appears at the
command centers. See Problems Found During Self Diagnostics in the D9412G/D7412G Installation and
Troubleshooting Quick Reference Guide for a description of each system trouble message.
Touch Terminal 10 first: If the on-board buzzer sounds briefly when the panel is touched, any static charge that
may be carried is being discharged to the panel. The panel may generate WATCHDOG RESET and/or PARAM FAIL
events. See section Watchdog Reset Reports in the D9412G/D7412G Installation and Troubleshooting Quick
Reference Guide for a description of these events. Always touch Terminal 10, the panel's earth ground connection,
before beginning work on the panel.
3.6.2

Install and Wire Detection Devices

Install and wire detection devices and command centers at their locations throughout the premises. DO NOT
make the connections at the panel end of the wiring yet.
Section 7.0 On-board Points contains instructions for wiring the on-board points to detection devices. Section 10.0
Arming Devices contains instructions for wiring the command centers.
Instructions for wiring the off-board point POPIT sensor loops are found in the instructions packaged with the
POPIT Modules.
3.6.3

Install Modules and Relays

1.
Power Down First: Power down the unit by unplugging the transformer and disconnecting the battery.
Radionics recommends powering down the unit when installing modules or relays, or when making wiring
connections to the panel.
2.
Install and wire any modules required for the installation as described in the module's installation
instructions.
Instructions for the D8125 POPEX Module, the D8128D OctoPOPIT Module, the D8129 OctoRelay Module, the
D811 Arm Status Relay Module, and the D928 Dual Phone Line Switcher appear in this manual.
See section 8.0 Off-board Points for D8125 and D8128D instructions. See section 9.0 Off-board Relays for
D8129 and D811 instructions. See section 6.12 D928 Dual Phone Line Switcher for instructions for the D928.
If using the power outputs at Terminals 7 or 8, install a D136 relay in the appropriate sockets. See section 5.4
3.
Programmable Power Outputs Terminals for instructions.
4.
If using a ground start phone system, insert a D136 relay in the ground start check socket and set the ground
start pin in the ground start position. See section 6.11 Ground Start for more information.
3.6.4

Make the Telephone Connections

See section 6.0 Telephone Connections . If connecting the panel to a ground start phone system, install a D136
relay (section 3.6.3 Install Modules and Relays ).
3.6.5

Connect the On-board Points and Command Centers

Connect the on-board points and command center wiring to the system. See section 7.0 On-board Points and
section 10.0 Arming Devices sections for instructions.
© 2002 Radionics
D9412G/D7412G Operation & Installation Guide
Page 23
D9412G/D7412G
Installation
43488D

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

D7412g

Table of Contents