Performance Tests; Test Equipment - Fluke 6060B Instruction Manual

Synthesized rf signal generator
Hide thumbs Also See for 6060B:
Table of Contents

Advertisement

Section
4A
Performance
Tests
4A-1.
INTRODUCTION
The
information
in
the following
paragraphs
describes the
performance
tests
for the
key
parameters
of the Signal Generator, using the
instrument
specifications as the
performance
standard.
These
covers-on
performance
tests
may
be used
as
an
acceptance
test
upon
receipt
of
the instrument, as
an
indication that repair
and/or
calibration
is
required,
or
as a
performance
verification after
completing
repairs
or
calibration
of the
instrument. Individual
performance
tests
can be used
as
troubleshooting
aids.
The
Signal
Generator
being
tested
(UUT)
must
be
warmed
up
with
all
covers
in
place for
at least
20 minutes before
starting
the
performance
tests.
Periodic calibration
is
recommended
once a
year.
4A-2.
TEST
EQUIPMENT
Table 4A-1
gives
a
list
of the
recommended
test
equipment
for the
performance
tests,
adjustment procedures,
and
for
troubleshooting
the
Generator. Figure
4A>1 shows
a
Two-Turn
Loop,
Figure 4A-1.
Two-Turn Loop
4A-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents