Alc Loop Control Voltage; Detector Linearity; Rpp Control - Fluke 6060B Instruction Manual

Synthesized rf signal generator
Hide thumbs Also See for 6060B:
Table of Contents

Advertisement

MAINTENANCE
TROUBLESHOOTING
AND
REPAIR
4D-47.
ALC
Loop
Control Voltage
PROCEDURE
1.
Connect
a
IV peak (2V
p-p),
1-kHz
signal
source
to the external
MOD
INPUT.
2.
Program
the
UUT
for
350
MHz,
7
dBm, 71%
AM
depth,
and
EXT
AM
ON.
3.
Measure
the
ac
and
the
dc
voltage
at
TP7. The rms
voltage
should be nominally
50%
of the
dc
voltage.
4.
Program
the
UUT
for
35%
AM
depth.
The rms
voltage
should be nominally
25%
of
the
dc
voltage.
If
the
UUT
fails
this
test,
the
problem
lies
somewhere
between
the
EXT
MOD
input
and
TP7 (ALC
loop-control
voltage).
To
further
localize
the
problem,
the
same
test
can be
done
by measuring
the ac voltage
at
U302
pin
8
(input
to
level
DAC).
If
the
measured
ac
voltage
does not change
as
programmed
AM
depth
is
changed,
either the
AM
DAC
or
its
control
is
at fault.
The
AM
DAC
(A2A4U301)
is
an
8-bit
DAC
and
is
set
to
twice the
programmed
AM
depth,
e.g.,
180 for
90% AM.
If
the
UUT
passes
this
test,
then
the
ALC
loop
control voltage
is
correct,
and
the
problem
is
in
the
ALC
loop.
A
likely
cause of
excessive
AM
depth
error
and harmonic
distortion
is
detector non-linearity.
The
following
test
checks
detector
linearity,
4D-48.
Detector
Linearity
PROCEDURE
1
.
Install
the
plate
covers
and
let
the
UUT
warm
up
at
room
temperature
for
one
hour.
2.
Program
the
UUT
for
350
MHz,
12
dBm,
modulation
OFF.
3.
Program [SPCL]
[8l[l]
and
[SPCL]
[9][l]to disable
level
correction
and
enable
amplitude
fixed range.
4.
Measure power
with
a
power
meter
at
the
UUT RF
OUTPUT.
Note
the reading.
5.
Program
the
UUT
for 2
dBm
using
the
EDIT
keys.
The
measured power
should
be
10
dB
±
0.2
dB
below
the
reading noted
in
step
4.
6.
Program
the
UUT
for
-8
dBm
using
the
EDIT
keys.
The
measured power
should be 20
dB
±
0.4
dB
below
the
noted
reading.
7.
Program
the
UUT
for
[SPCL]
[0][0].
If
the
UUT
fails
this
test,
the
problem
is
likely
to
be
in
the detector or detector-Unearizer
circuit.
If
the
UUT
passes the
test,
the
problem
is
constrained
to the
other
ALC
loop
elements,
and
is
likely
to
be a
bandwidth problem
associated
with
the
loop
amplifier or
the
modulator
or modulator-linearizer
circuit.
4D-49.
RPP
Control
.
,
*
*
When
servicing the
A2A5 A2
Attenuator/
RPP
Control
PCB,
use the
three
dual-pm
test
points to aid
in
the
troubleshooting of
the assembly.
The
RPP
can be
tripped
(to
the
protect position)
by momentarily
shorting the
two
points of
TP
I.
It
can be
reset
by
4D-21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents