Fitting The Electrode-Insert Cover (Part Two) - Emerson Mobrey Hydratect 2462 Reference Manual

Steam/water detection system
Table of Contents

Advertisement

Installing the electrodes
March 2017
Figure 2-4. Electrode Fitting
A. Mobrey Series III Electrode.
B. Installed base plate of insert cover.
See
"Fitting the electrode" on page 15
2.2.4

Fitting the electrode-insert cover (part two)

Even if the electrode cable is soon to be connected, it is advisable to complete the
installation of the cover rather than leave the electrode exposed to possible damage.
The cover should be removed just prior to fitting the cable and then re-fitted
immediately afterwards.
This is the final part of the electrode installation procedure.
Part two of the cover fitting procedure
1.
2.
16
C
B
for the recommended tightening procedure.
Fit the cylindrical housing, positioning the cable gland downwards for horizontal
pipes and as close as possible to downwards for vertical pipes.
(see
Figure 2-5 on page
17).
Fit the top plate and two stud bolts and secure the plate with the two knurled nuts
and washers (see
Figure 2-5 on page
A
C. Horizontal pipe run.
D. Vertical pipe run.
17).
Reference Manual
24625020, Rev AA
D
Installing the electrodes

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents