3 Mounting frame
A stand off frame is an option for easy and fast upward piping behind the boiler; a pipework kit is an option for a upward piping in
combination with the stand off frame.
4 Boiler installed
MCR 24
France + Other countries
Return connection (Inside diameter 18 mm)
Flow connection (Inside diameter 18 mm)
Gas connection (Inside diameter 18 mm)
Combustion air inlet (diameter 100)
Flue gas discharge duct (diameter 60)
Return storage tank (Inside diameter 16 mm)
Outlet storage tank (Inside diameter 16 mm)
Condensates evacuation pipe (3/4")
Safety valve (diameter 15)
08/06/06 - 300008460-001-B
Return connection (External diameter 22 mm)
Flow connection (External diameter 22 mm)
Gas connection (External diameter 22 mm)
Combustion air inlet (diameter 100)
Flue gas discharge duct (diameter 60)
Return storage tank (External diameter 15 mm)
Outlet storage tank (External diameter 15 mm)
Condensates evacuation pipe (3/4")
Safety valve (diameter 15)
MCR 24, 24/28 MI, 30/35 MI, 34/39 MI
Belgium + Germany + Poland
9