Installation - DeDietrich MCR 24 Technical Instructions

Wall-hung gas condensation boilers
Hide thumbs Also See for MCR 24:
Table of Contents

Advertisement

Residential buildings for France
Statutory terms and conditions of installation and maintenance
The installation and maintenance of the appliance must be carried
out by a qualified professional in compliance with the statutory texts
of the codes of conduct in force, particularly :
- Order of 2 August 1977
Technical and safety rules applicable to combustible gas and
liquefied hydrocarbon installations situated inside residential
buildings and their annexes.
- NF P 45-204 standards
Gas installation, (formerly DTU 61-1, gas installations: April 1982,
addendum no 1: July 1984).
- Local Sanitary Regulations
For appliances connected to the electricity network:
- NF C 15-100 standards Low voltage electrical installation - Rules.
Establishments open to the public (France)
Statutory terms and conditions of installation
The installation and maintenance of the appliance must be carried
out in compliance with the statutory texts and rules of the codes of
conduct in force, particularly:
- Safety regulations against fire and panic in establishments open to
the public:
a. General regulations
For all appliances:
- Articles GZ - Installations operating on combustible gases and
liquefied hydrocarbons
Then, depending on use:
- Articles CH-Heating, ventilation, refrigeration, air conditioning and
production of steam and domestic hot water
b. Instructions specific to each type of establishment open to
the public (hospitals, stores, etc.)
The boiler installation and gas connection must be carried out by a
qualified professional in compliance with the NBN D 51.003, NBN D
30.003, NBN B 61.001, NBN B 61.002 and NBN D 51.006 standards.
An ARGB approved stop valve must be fitted in the pipe leading to
and close to the boiler.
Electrical connections must comply with the instructions in the
general regulations on electrical installations (RGIE).
Belgium:the cross-section of the aeration vents, which are
compulsory in the room in which the boiler is installed, must comply
with the NBN D 51-003 standard.
08/06/06 - 300008460-001-B
Belgium
MCR 24, 24/28 MI, 30/35 MI, 34/39 MI

Installation

17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mcr 24/28 miMcr 30/35 miMcr 34/39 mi

Table of Contents