Connecting The External Controls - DeDietrich MCR 24 Technical Instructions

Wall-hung gas condensation boilers
Hide thumbs Also See for MCR 24:
Table of Contents

Advertisement

3 Connecting the external controls

- Unscrew the 2 screws.
- Remove the front panel of the cladding.
- Run the cables in the cable clamps.
- Connect the cables to the connectors (See drawing opposite).
Switch off the mains electricity supply before carrying out
any work.
28
MCR 24, 24/28 MI, 30/35 MI, 34/39 MI
08/06/06-300008460-001-B

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mcr 24/28 miMcr 30/35 miMcr 34/39 mi

Table of Contents