Installing The Mounting Frame - DeDietrich Innovens MCA 15 Installation And Service Manual

Wall-hung gas condensing boilers
Hide thumbs Also See for Innovens MCA 15:
Table of Contents

Advertisement

4. Installation
4.4

Installing the mounting frame

1
2
3
4
20
The boiler is delivered with a mounting template.
1. Position the mounting template to the wall with adhesive tape.
CAUTION
Using a spirit level, check that the mounting axis is
perfectly horizontal.
2. Drill 3 holes with a Ø of 10 mm.
Additional holes are provided in case one or other of the
standard locating holes prevents the correct location of the
plugs.
3. Put the plugs in place.
4. Secure the mounting frame to the wall using the 3 hexagonal
headed screws provided for this purpose.
T001869-A
MCA 15 - MCA 25 MCA 25/28 MI
29/04/2010 - 300022146-001-B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innovens mca 25/28 miInnovens mca 25

Table of Contents