4.1.3
In particular for Germany
Abide by the following standards, rules and directives when installing
and commissioning the boiler:
- DIN 4705: calculation of chimney dimensions
- DIN EN 12828 (June 2003 edition): heating systems in buildings.
Planning of hot water heating installations (up to a maximum
operating temperature of 105°C and a maximum output of 1 MW)
4.2 Package list
See assembly instructions
4.3 Mounting
For mounting instructions, see installation instructions.
4.3.1
Main dimensions
(1)
Burner centre line
(2)
The lateral control panel can be mounted to the right or left of
the boiler. Exact height positioning defined by the fitter during
assembly.
(3)
max
25/01/2012 - 300011906-001-D
- DIN 4753: drinking and industrial water heating installations
- DIN 1988: technical rules on drinking water installations (TRW)
- DVGW-TRGI: technical rules on gas installations, including
complementary equipment
- Working paper DVGW G 260/I: technical rules on the nature of the
gas
Heating flow - Ø E (weld)
Heating return - Ø E (weld)
Draining - Mk3/4
Flow switch
Minimum height for sweeping = 850
GT 530
15