Fluke 434-II User Manual page 37

Three phase energy and power quality analyzer
Hide thumbs Also See for 434-II:
Table of Contents

Advertisement

For single phase measurements, use current input A (L1) and the voltage inputs Ground,
N(eutral), and phase A (L1).
A (L1) is the reference phase for all measurements.
Before making any measurements, set the Analyzer up for the line voltage, frequency,
and wiring configuration of the power system you want to measure. This is explained in
Chapter 24, General Settings.
Scope Waveform and Phasor display are useful to check if voltage leads and current
clamps are connected correctly. In the vector diagram the phase voltages and currents A
(L1), B (L2), and C (L3) should appear in sequence when observing them in clockwise
direction as shown in the example in Figure 6-3.
info@Fluke-Direct.ca
Figure 6-3. Vector diagram for correctly connected Analyzer
Fluke-Direct
Input Connections
Input Connections
.ca
1.800.868.7495
6
6-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

435-ii437-ii

Table of Contents