Perform Pre-Operation Inspection; Perform Function Tests - Genie Lift Service Manual

Table of Contents

Advertisement

September 2016
A-2
A-2 Per form Pre- operation Ins pection

Perform Pre-operation Inspection

Genie specifications require that this procedure be
performed every 8 hours or daily, whichever comes
first.
Completing a Pre-operation Inspection is essential
to safe machine operation. The Pre-operation
Inspection is a visual inspection performed by the
operator prior to each work shift. The inspection is
designed to discover if anything is apparently
wrong with a machine before the operator performs
the function tests. The Pre-operation Inspection
also serves to determine if routine maintenance
procedures are required.
Complete information to perform this procedure is
available in the appropriate operator's manual.
Refer to the Operator's Manual on your machine.
Part No. 115417
Checklist A Procedures
A-3
A-3 Per form F uncti on Tes ts

Perform Function Tests

Genie specifications require that this procedure be
performed every 8 hours or daily, whichever comes
first.
Completing the function tests is essential to safe
machine operation. Function tests are designed to
discover any malfunctions before the machine is
put into service. A malfunctioning machine must
never be used. If malfunctions are discovered, the
machine must be tagged and removed from
service.
Complete information to perform this procedure is
available in the appropriate operator's manual.
Refer to the Operator's Manual on your machine.
Genie Lift
Service Manual
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents