Inspect The Carriage Hold-Down Bar; Inspect All Welds - Genie Lift Service Manual

Table of Contents

Advertisement

Service Manual
Checklist B Procedures
B-4
B-4 Ins pect the C arriage Hol d-down Bar
Inspect the Carriage Hold-down
Bar
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Detection of damage to the carriage hold-down bar
assembly is essential to safe machine operation.
An unsafe working condition exists if the system is
damaged and does not operate properly.
1
Fully lower the carriage.
2
Rotate the carriage hold-down bar over the
carriage.
3
Raise the carriage
Result: The carriage should not move.
Component Damage Hazard.
Do not apply too much force on
the carriage. Raise it only
enough to check the resistance
against the hold-down bar.
4
Visually inspect the assembly for damage.
26
B-5
B-5 Ins pect All W elds

Inspect All Welds

Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Weld inspections are essential to safe machine
operation and good machine performance. Failure
to locate and repair damage may result in an
unsafe operating condition.
1
Visually inspect the welds in the following
locations:
• Base and base components
• Legs
• Carriage
• Forks
• Boom (if equipped)
Genie Lift
September 2016
Part No. 115417

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents