Verifying the installation

Before powering on the switch, verify that the following requirements are met:
Sufficient clearance is reserved around the switch for heat dissipation.
The rack or workbench is stable.
The grounding cable is connected correctly.
The power source is as required by the switch.
The power cords are connected correctly.
All the interface cables are cabled indoors. If any cable is routed outdoors, verify that a surge
protected power strip is used for the AC power cord and lightning arresters have been used for
network ports.