Index - H3C S5120-SI Installation Manual

Hide thumbs Also See for H3C S5120-SI:
Table of Contents

Advertisement

Index

A C E G I L M N P R S T V W
A
AC and RPS power input
AC power input
failure,29
Accessing the IRF fabric to verify the
configuration,28
Attaching the mounting brackets to the
C
Chassis
views,32
Cleanliness,2
Configuration terminal display
Configuring basic IRF
Connecting an AC power
Connecting an RPS DC power
Connecting the console
Connecting the physical IRF
Connecting the power
Console
port,40
E
EMI,2
Examining the installation
G
Garbled
display,30
Grounding the
switch,14
Grounding the switch by using the PE wire of the AC
power
cord,17
Grounding the switch with a grounding conductor
buried in the earth
ground,16
Grounding the switch with a grounding
I
Identifying physical IRF ports on the member
switches,26
Identifying the master switch and planning IRF
member
IDs,24
Installation
flow,4
Installation
procedure,11
Installation
procedure,13
Installation
tools,3
Installing a surge protected power
IRF fabric setup
flowchart,23
L
Laser
safety,3
LEDs,42
failure,29
switch,5
problems,30
settings,27
cord,17
cord,19
cable,21
ports,27
cord,17
site,1
strip,14
strip,45
M
Magnet-mount
kit,12
Magnet-mounting the
Mode
LED,42
Mounting
brackets,5
Mounting the switch in a
N
No
display,30
P
Planning IRF fabric
Planning IRF fabric size and the installation
Planning IRF topology and
Planning the cabling
Ports,40
Power status
LED,42
Power supply
failure,29
R
Rack-mounting the
RPS power input
failure,29
RPS status
LED,42
S
S5120-20P-SI,32
S5120-28P-HPWR-SI,36
S5120-28P-PWR-SI,35
S5120-28P-SI,33
S5120-52P-SI,33
S5120-9P-HPWR-SI,35
S5120-9P-PWR-SI,34
S5120-9P-SI,32
Safety
recommendations,1
Setting terminal
parameters,22
Setting up the configuration
Starting the
switch,22
T
Technical
specifications,37
Temperature/humidity,1
V
Verifying the
installation,20
W
Wall
anchor,10
47
switch,12
rack,8
setup,24
connections,25
scheme,26
switch,4
environment,21
site,24

Advertisement

Table of Contents
loading

Table of Contents