Battery Maintenance, Disposal And Recycling - ABB Conceptpower DPA 500 User Manual

Ups system 100 - 500 kw
Hide thumbs Also See for Conceptpower DPA 500:
Table of Contents

Advertisement

The battery testing can be carried out independently of the operation mode (OFF-LINE or ON-LINE) and whether
or not the load is connected. The battery test procedure can be performed from the UPS display, in the service
setup mode.

7.4 BATTERY MAINTENANCE, DISPOSAL AND RECYCLING

The battery maintenance shall be done by a certified Service Partner.
To ensure an optimum operation of the UPS system and a continuous and efficient protection of the connected
load it is recommended to check the batteries every 12 months.
Batteries contain dangerous substances that will harm the environment if thrown away. If you change the batteries
yourself, call qualified organizations for battery disposal and recycling.
04-3275_OPM_ABB_CONCEPTPOWER_DPA_500kW_EN_REV-A.docx
Page 60/78 ABB
Modifications reserved

Advertisement

Table of Contents
loading

Table of Contents