Furuno TZTBB Installation Manual page 14

Multi function display black box type
Hide thumbs Also See for TZTBB:
Table of Contents

Advertisement

2. WIRING
10. Fix the cables to the cable clamp with cable ties (2 pcs. each).
Attach a cable tie at the base of waterproofing tube.
Note: Cable ties are necessary for waterproofing. Do not fail to attach them.
Cable ties for
Cable ties for
fixing
waterproofing
11. Pass the opposite end of the DVI-D cable (connected at step 1) through the out-
side entrance of the connector cover.
12. Connect the plug to the DVI-IN port and fasten the plug with the screws on the
plug.
13. Pass the DVI-D cable and USB cable for external touch monitor through the out-
side entrance of the connector cover.
14. Connect the DVI-D plug to the DVI OUT1 port and connect the USB plug to the
USB2 port.
15. If the second touch monitor is installed, connect the DVI-D plug to the DVI OUT2
port and connect the USB plug to the USB3 port.
16. Pass the power plug and USB plug from the switch box PSD-002 through the con-
nector cover then connect them to the PWR SW port and the USB1 port, respec-
tively.
17. If another USB device is installed, connect the USB plug to USB4 port.
18. Fasten the connector cover to the unit with six binding screws.
19. Attach the fixing plate1 to the entrance of the connector cover.
20. Pass the cables through appropriate holes in the gasket.
21. Set the gasket to the entrance of the cover.
2-6
Add a tie for
waterproofing
Fix the cables
with cable ties
Insert the gasket to the
entrance of cover so the slits in
the holes face downward.
Bottom side

Advertisement

Table of Contents
loading

Table of Contents